The
Westville Water Plant was opened on January 1,
2001. The plant is supplied by 2 wells, each
rated at 715 gpm. Vertical pumps move the water
from the wells through the main building where
chlorine is injected. The water continues to
the aeration tank where iron and odors are removed.
The water accumulates in a retention tank. High
service pumps pull water from the tank and pump
it through a sand filter where chlorine and fluoride
are injected. The treated water then enters the
service main. Two elevated tanks maintain the
pressure and volume iWednesday, June 25, 2008 4:21 PM the tanks filled to a preset
level. |